- This topic is empty.
-
Topic
-
How about doing a new run of the 460-315-RF-AV3 moulds… please.
Personally I could use the HP version in both a version GC for the 460 S&W and a PB version for some 45-70 light RG hollow point loads.
That way one could basically run the spectrum from ~285 Gr cast bullet weights in both version up to ~ 315 Gr depending on which RG pins were installed in the mould…For those that may also be interested here is the link to the store web page…
https://noebulletmolds.com/site/product-category/458-460/460-315-rf-av3/
If anyone else is interested in getting a mould that has been listed or something new that is out of stock & thus manufactured previously… traditionally it has been the separate requests to buy from 5 individuals for an out of stock item, & 10 individuals for a new mould design. Note if you put in a request for a mould try to think of it as a promise to purchase that mould down the line…
Attached below as a quote is the NOE Group Buy Policy that NOE has on its web page… that touches on that subject…
https://noebulletmolds.com/site/about-us-2/group-buy-rules/
Group Buy Rules
HOW WE RUN OUR BUYS
Group Buys generally start in the “Group Buy Discussion” section of the forums.
New buys are posted to see what level of interest is present and to get an idea in
numbers of moulds wanted. This is also the time that any design changes are
be discussed and made.Buys with sufficient interest are then moved to the Active Group Buy Section of the forum
and the buys are added to the site in the group-buy category. The Order page on the site will
show the details about the buy including start and close dates, minimum orders required,
and the finalized drawings for the mould.When you place an order, you will be billed for that mould. Due to the large number
of drop-outs from previous buys, we are changing this to determine committed buyers
and remove the tire-kickers from the equation. At the close date, we will either
announce the close of the buy and the expected run date and shipping date, or we will
announce the failure of the buy to generate the minimum number of orders and refunds
will be issued to those in the buy. All refunds should be dispersed within 10 business
days after the close of an unsuccessful buy. At the time the buy closes, the forum will
also be updated and the thread moved to “Closed Group Buys”.For successful buys, Tooling generally takes a week to 10 days to prepare and then moulds
can be cut and prepared for delivery. Expect production times of 5 to 6 weeks from close
of buy to ship date.Take Care , & Stay Safe…
- You must be logged in to reply to this topic.
