250-51-FN (Bob’s Boat Tail) -14- GB260 2/22/16

Home Forums NOE Forums NOE Archive Historical Archive Group Buys Archived Buys 250-51-FN (Bob’s Boat Tail) -14- GB260 2/22/16

  • This topic is empty.
Viewing 15 replies - 61 through 75 (of 89 total)
  • Author
    Replies
  • #501622
    thomasbuchanan
      Up
      0
      Down
      ::

      i will take a 4 cav alum 253/255
      thanks mule

      #501623
      adamsutherland
      Moderator
        Up
        0
        Down
        ::

        List updated.

        #501624
        thurmondmoore
          Up
          0
          Down
          ::

          If it is possible to still get in on this, I want a .255/.253 2 cavity aluminum with Lyman HP pin in 1 cavity (for an AirForce .25 condor barrel).

          Thanks
          Thurmond

          #501625
          adamsutherland
          Moderator
            Up
            0
            Down
            ::

            List updated.

            #501561
            thurmondmoore
              Up
              0
              Down
              ::

              I just slugged my .25 Airforce Condor barrel and if possible I need to change my request to .252/.250 2 cavity aluminum with Lyman HP pin in 1 cavity.

              Thanks
              Thurmond

              #501626
              rogertrall
                Up
                0
                Down
                ::

                Put me down for one 252/250, 2 cavity aluminum.

                #501627
                adamsutherland
                Moderator
                  Up
                  0
                  Down
                  ::

                  List updated.

                  #501628
                  thomasraether
                    Up
                    0
                    Down
                    ::

                    How many weeks does a “last call” last?

                    #501629
                    adamsutherland
                    Moderator
                      Up
                      0
                      Down
                      ::

                      See rely no.54.

                      Al is tooled back up again now and he is started on the backlog so things are moving.

                      #501630
                      AlvinYork
                      Participant
                        Up
                        0
                        Down
                        ::

                        Is the mill queue similar to a multilevel feedback queue? Meaning, in the terms of mould builds, it’s not he who waits longest, but he who has the most names on the “I want” list that determines who is next (more names == higher priority level)? Which is perfectly understandable. I guess when the activity for the “hot” moulds dies down we’ll get access to the mill.

                        #501631
                        adamsutherland
                        Moderator
                          Up
                          0
                          Down
                          ::

                          They pretty much come out in chronological order from the time of having the required number on the list.

                          If it went the other way then some designs that only had the magic ten might be bumped forever and that doesn’t happen, the only thing that seems to alter the schedule is when something unforeseen happens or there are opportunities to slip something through.

                          #501632
                          thurmondmoore
                            Up
                            0
                            Down
                            ::

                            Just curious if there is an approximate time frame for production of these moulds? 6 weeks? 3 months? I want to budget for them and The Feds are about to make me quite poor for a good long while :(

                            Thurmond

                            #501633
                            SNEAKY_NL
                              Up
                              0
                              Down
                              ::

                              Just curious if there is an approximate time frame for production of these moulds? 6 weeks? 3 months? I want to budget for them and The Feds are about to make me quite poor for a good long while :(

                              Thurmond

                              ???

                              #501634
                              thurmondmoore
                                Up
                                0
                                Down
                                ::

                                Income TAX Time!  ::)

                                Thurmond

                                #501635
                                AlvinYork
                                Participant
                                  Up
                                  0
                                  Down
                                  ::

                                  Just want to bring this back to the front line. Don’t want anyone to forget this interesting projectile.

                                Viewing 15 replies - 61 through 75 (of 89 total)
                                • You must be logged in to reply to this topic.